Small hydro powerplants - installed on location

 

Drenje - Under construction

Small Hydropower Plant „Drenje“ in the Municipality of Vladicin Han is planned to be built on the Mutnica River belonging to the South Morava basin. The powerplant’s intake is desinged in the reverbed of mutnica River, where Lebedska River flows into Mutnica River. Projected installed capacity of this SHPP is 635kW. The preservance of the flora and fauna in this area was particulary taken into consideration. Therefore, it is planned to construct an intake which ensures the biological minimum downstreams from the barrieres.

Dzep 2- Under construction

Small hydro Power Plant „Džep 2” is located on the riverside of South Morava River besides the Village of Dzep, in the theritory of Municipality of Vladicin Han. The facilities of SHPP shall be located in the riverbed of South Morava River and it’s branch, besides the Village of Dzep and close to railway and highway Belgrade- Skoplje. This plant belongs to Dam type of hydropower plants. Planned installed capacity of SHPP “Dzep 2” is 757kW.

Trliste - Under construction

It is planned to have a small hydropower plant built on the river Mutnica, at the water intake where there would be enough water taken in order to have this plant constructed. Water intake is planned to be set in the river bed of the Mutnica river, at the confulence of a stream Recica into the Mutnica river, east to Drenje. The construction of powerhouse is planned to begin on the west side of Trziste, close to Prevalac, Municipality of Vladicin Han. Planned installed capacity of this powerplant is 518kW. This powerplant belongs to a group of derivation plants with water running through and it is planned to have a construction fall out of cca.96 m. This small powerplant will be equipped with a remote control system, meaning there shall be no manpower to handle it.

Jelimirovci - Under construction

Small hydropower plant „Jelimirovci” uses the hydro power of the river Vrla, which emerges at the territory of Vlasina lake and close to Vladicin Han it flows into the Juzna Morava river. The location of SHPP Jelimirovci belongs to Surdulica Municipality. Powerhouse is planned to be built on the location, where stream Javorica has its confulence into the river Vrla, namely in its riverbed, on a way to water plant „Rosa” in Topli Do, at a cca.929 mnm point. Water catchment is planned to be set in the Vrla riverbed, downstream Vodenicari, at a cca. 1022 mnm point. The projected installed capacity of this SHPP shall be 340kW.

SHPP Dzep

 Hydropower Plant “Džep” falls under category of small hydropower plants with average head/fall. This power plant draws water from catchment area of Dzepska River, which originates from Mutnica River and Garvanica River. Dzepska River is a left tributary of the South Morava River, which flows into it just upstream from the Dzep Village, in the Municipality of Vladicin Han. The powerhouse is located just upstream of Dzep Village and the position of the intakes is 3km upstream. This plant belongs to derivative type of hydropower plants. Planned installed capacity of SHPP “Dzep” is 990 kW
  The construction of SHPP Dzep is finished. For the purpose of functioning of the SHPP Ljuti dol, the Investor has provided the equipment of high quality workmanship and performances, manufactured by a reputable company with a long and successful business tradition around the world.

 

 

 

SHPP Ljuti Dol

  Hydropower Plant “Ljuti dol” falls under category of small hydropower plants with average head/fall. This power plant draws water from catchment area of Bozicka River, Topodolska River and from streams of the same catchment area. SHPP „Ljuti dol“ is located on the theritory of two municipalities, Municipality of Bosilegrad and Municipality of Surdulica, in Southeast Serbia. The structure of SHPP Ljuti dol contains three intakes: Gložanska mahala, Bratin dol and Romanova mahala. This plant belongs to derivative type of hydropower plants. Planned installed capacity of SHPP “Ljuti dol” is 630 kW.
  The construction of SHPP Ljuti dol is finished. For the purpose of functioning of the SHPP Ljuti dol, the Investor has provided the equipment of high quality workmanship and performances, manufactured by a reputable company with a long and successful business tradition around the world.